RTRI REPORT, Vol.16 No.8, Aug. 2002 |
| PAPERS | ||
| A New Method of Estimating Epicentral Distance and Magnitude for Early Earthquake Detection | ||
| S.TSUKADA, T.ODAKA, K.ASHIYA (1) | ||
| Methodology for Urgent Prediction of the Degree of Earthquake Damage on Railway Structures | ||
| Y.MURONO, K.ASHIYA (7) | ||
| Development of a New Real-Time Seismograph using a New Method of the Focal Parameters Estimation Algorithm | ||
| S.SATO, S.TAYA, K.ASHIYA (13) | ||
| Simulation of Failure Mechanism of RC Column Before and After Seismic Strengthening | ||
| F.UEHAN, K.MEGURO (17) | ||
| A New Stability Evaluation Method for Rock Slopes based on the Analyses of Primary Causes of Rockfalls and Rock Slope Collapses | ||
| T.NOGUCHI (23) | ||
| Deformation Characteristics of Wire Netting for Simple Rockfall Protection Barriers in Load Tests | ||
| M.SAMIZO, H.MURAISHI, T.SUGIYAMA, K.ANDO (29) | ||
| A Simple Method for Estimating Daily Amount of Snowmelt using Air Temperature Data | ||
| K.KAWASHIMA, S.IIKURA, T.SUGIYAMA, T.ENDO, T.FUJII (35) | ||
| A Study on Changes in Water Content and Soil Strength in Fusion Process of Frozen Ground | ||
| T.SUGIYAMA, K.KAWASHIMA, S.IIKURA, O.NUKOKAWA, Y.SAITO (41) | ||
| Evaluation of Snow Accretions under the Car Body using the Digital Pictures | ||
| S.IIKURA, K.KAWASHIMA, T.ENDO, T.FUJII (47) | ||
Copyright(c) 2002 Railway Technical Research Institute